(314) 865-2662Request a Quote

Search services, guides and terms

Asbestos abatement and demolition in Chicago, Illinois

Chicago, Illinois is about 265 miles from the Advanced Environmental Services office in St. Louis in a straight line, and about 299 by road. The city's Department of Environment takes asbestos and demolition notices online. About 73.2% of Chicago homes were built before 1980. AES takes projects within 300 miles.

Commercial space sealed with plastic containment and air machines during AES mold remediation
Building wrapped in white containment sheeting during an AES lead abatement project
Building wrapped in white containment sheeting with an AES storage container in front

Served from St. Louis

The AES office is in St. Louis, about 265 miles away in a straight line and about 299 by road. Plan scheduling early.

City environment department

The Chicago Department of Environment takes asbestos and demolition notices online. It was restored on May 1, 2026.

Chicago-licensed applicants only

Only employees of Chicago-licensed general contractors or expediters may apply for a demolition permit.

Older housing

About 73.2% of Chicago homes were built before 1980, so surveys matter before renovation or demolition.

Chicago at a glance

Office to downtown Chicago
About 265 miles in a straight line, about 299 by road (free-flow estimate, about 340 minutes)
router.project-osrm.org
Chicago homes built before 1970
65.5%
api.censusreporter.org
Chicago homes built before 1980
73.2%
api.censusreporter.org
Cook County homes built before 1980
71.5%
api.censusreporter.org
Chicago housing units counted
1,282,248
api.censusreporter.org
Chicago Department of Environment restored
May 1, 2026
data.cityofchicago.org
Demolition permit portal
Inspection, Permitting & Licensing Portal since August 10, 2026
chicago.gov
Chicago water PFAS samples (2014, 2020, 2024)
All non-detect
chicago.gov
Map of the area within 300 miles of the Advanced Environmental Services office in St. Louis, MissouriColumbiaSpringfield, ILSpringfield, MOIndianapolisKansas CityMemphisLouisvilleNashvilleChicagoDes MoinesLittle RockSt. Louis
OfficeWithin 300 milesArea pageMap data: US Census Bureau.

Does Advanced Environmental Services work in Chicago, Illinois?

Yes. AES takes projects within 300 miles of its St. Louis office, measured in a straight line. Chicago is about 265 miles away that way and about 299 by road. The office is at 3100 Gravois Ave in St. Louis. Plan lead time for the trip.

A distant job needs early scheduling, a clear scope and a site walk that someone can arrange in advance.

AES has 30 years of experience and serves residential, commercial, industrial, governmental and healthcare customers. See the asbestos abatement page for scope, and the commercial asbestos removal page for larger work.

Is AES licensed for asbestos work in Illinois?

AES is licensed for asbestos work in Missouri and Illinois, per its 2024 capabilities statement. Illinois Department of Public Health licenses asbestos contractors.

Illinois Department of Public Health says every contractor who runs an asbestos abatement project needs insurance and a license. Ask any contractor for proof before you sign. Our guide to hiring an asbestos contractor in Missouri lists questions that apply in any state. AES also holds Missouri DNR asbestos contractor registration 27-06-0640.

Who takes asbestos and demolition notices in Chicago?

The Chicago Department of Environment takes them, and all notices and applications go online. It does not accept mail or walk-in filings. City records say the department was restored on May 1, 2026, after the health department handled these notices from 2012. The process is recent, so confirm each step with the city.

Illinois EPA sits above the city. As of November 2026, it asks for a notification form 10 working days before a regulated project, with a $150 fee. Its page says Cook County outside Chicago no longer uses the combined form and uses its own online system.

Question Who to ask
Asbestos and demolition notices in Chicago Chicago Department of Environment (online)
State notice rule and fee Illinois EPA
Asbestos and lead licenses Illinois Department of Public Health
Demolition permit Chicago Department of Buildings

Learn the terms in our glossary: NESHAP, asbestos-containing material and regulated asbestos-containing material. Our guide to Missouri demolition and renovation asbestos rules shows a neighboring state’s order of steps. Use the Illinois and Chicago pages for a Chicago project.

Who can apply for a demolition permit in Chicago?

Only employees of Chicago-licensed general contractors and Chicago-licensed expediters can submit a Chicago demolition permit application. Since August 10, 2026, applications go through the city’s Inspection, Permitting & Licensing Portal. Every applicant also files a Demolition Notice of Intent with the Department of Environment.

The city lets applications started under the old process before August 6, 2026 continue that way until December 30, 2026. Check the city’s demolition permit page for the current process. AES can tell you how it handles Chicago permits when you request a quote. Ask early, because the permit rule shapes who can lead the job.

A regulated demolition follows an order. Survey first, then the notice, then licensed abatement for any asbestos found, then the permit. Read demolition from survey to debris. AES offers building demolition and interior demolition. Learn about interior demolition in the glossary.

How old are the homes in Chicago?

Older than most places near St. Louis. About 65.5% of Chicago’s 1,282,248 housing units were built before 1970, and 73.2% before 1980, per the 2024 American Community Survey. Cook County overall is 71.5% before 1980.

Area Built before 1970 Built before 1980
Chicago 65.5% 73.2%
Cook County, Illinois 59.4% 71.5%
City of St. Louis 81.7% 87.1%

Homes from those decades often have vinyl floor tile, joint compound, roofing, siding or pipe wrap that contain asbestos. Age alone does not prove it. A survey does. Read what an asbestos survey covers. AES offers asbestos testing and an asbestos survey. For the St. Louis comparison, see St. Louis, MO.

What about lead paint and mold in Chicago buildings?

Illinois Department of Public Health licenses lead abatement contractors, supervisors, inspectors, risk assessors and workers. Do not scrape, sand or burn old paint yourself. The federal RRP rule covers paid work that disturbs paint in pre-1978 housing. Read about lead-based paint and lead abatement.

AES offers lead abatement. Our guide to lead paint in pre-1978 homes explains the basics.

Water damage can lead to mold in any building. AES offers mold remediation, commercial mold remediation and mold inspection. Read mold after water damage first, because fixing the water source comes before cleanup. Learn the term mold remediation.

What does Chicago’s water report say about PFAS?

The city says its drinking water was sampled for PFAS in 2014, 2020 and 2024, and that all studies yielded non-detect results. That is the city’s statement about treated water. It does not cover your building, a private well or soil on a property.

EPA’s PFAS drinking water rule status changes, so check EPA’s own page for the current standard. Learn the terms: PFAS and parts per trillion. Read our PFAS drinking water rule explained guide. AES offers PFAS testing and PFAS remediation.

Which AES services fit Chicago projects?

AES serves projects within 300 miles of St. Louis, and each page explains scope on its own.

See every town we list on the service areas page. Closer to the office? See St. Louis County and St. Charles, Missouri.

How should I plan a job that is 299 road miles from the AES office?

Send details early and plan the notice and permit steps into the schedule. A Chicago job needs the same steps as any regulated project, plus a long trip. Early information lets AES scope the work before a site visit.

  1. Gather the basics. Address, building age, what you plan to renovate or demolish, and any past survey.
  2. Order a survey if you have none. Results set the scope for abatement or demolition.
  3. Build in the notice. Illinois EPA asks for the form 10 working days before a regulated project starts. Ask the Chicago Department of Environment what else applies.
  4. Settle who applies for the permit. Only Chicago-licensed contractors or expediters can file a demolition permit application.
  5. Set the schedule. Confirm the site walk, the start date, and the expected duration in writing.

Your best first call is to (314) 865-2662.

Next step

Call (314) 865-2662 or send our quote form with your Chicago address, building age and the work you plan. We will tell you what the trip and the permit rules mean for scheduling. Start with the asbestos abatement page.

Frequently asked questions

Does AES serve Chicago, Illinois?

Yes. AES takes projects within 300 miles of its St. Louis office, measured in a straight line. Chicago is about 265 miles away that way and about 299 by road, a free-flow estimate. The office is in St. Louis, so plan scheduling early. Call (314) 865-2662 or use the quote form.

Is AES licensed for asbestos work in Illinois?

AES is licensed for asbestos work in Missouri and Illinois, per its 2024 capabilities statement.

Who takes asbestos and demolition notices in Chicago?

The Chicago Department of Environment. It does not accept permit applications by mail or walk-in, and every notice goes online. City records say the department was restored on May 1, 2026, after the health department handled these notices from 2012. Check the city page before you file.

Who can apply for a Chicago demolition permit?

Only employees of Chicago-licensed general contractors and Chicago-licensed expediters can submit demolition permit applications. A separate Demolition Notice of Intent goes to the Department of Environment first. Ask AES how it handles Chicago permits when you request a quote.

How old are homes in Chicago?

Older than most cities near St. Louis. About 65.5% of Chicago homes were built before 1970 and 73.2% before 1980, from 1,282,248 housing units in the 2024 American Community Survey. Cook County is 71.5% before 1980. Check your building's year before you renovate.

Has PFAS been found in Chicago's water?

The city says samples from 2014, 2020 and 2024 all yielded non-detect results. Standards and testing change, so read the city page and EPA's own page for the latest. A city report covers treated water, not your building or soil.

Terms on this page

Sources

  1. OSRM route estimate: office to downtown Chicago
  2. U.S. Census Bureau: ACS 2024 1-year, table B25034 (Chicago and Cook County)
  3. City of Chicago Department of Environment: permitting overview
  4. City of Chicago Department of Environment: demolition notice of intent
  5. City of Chicago Data Portal: DOE asbestos and demolition notifications
  6. City of Chicago Department of Buildings: guide to demolition permits
  7. City of Chicago Department of Buildings: demolition permits
  8. Illinois EPA: Asbestos
  9. Illinois EPA: notice timing and fee
  10. Illinois Department of Public Health: Asbestos
  11. Illinois Department of Public Health: lead abatement licensure
  12. City of Chicago Department of Water Management: PFAS findings
  13. Advanced Environmental Services: 2024 capabilities statement
  14. Missouri DNR: Asbestos contractor registrations

Checked against the sources above on November 2, 2026. Rules and fees change, so check the linked page before you act.

Request your custom environmental remediation estimate

Contact us for a free environmental remediation or restoration estimate and a personalized solution to your problems.

CallRequest a Quote